Sign In | Join Free | My insurersguide.com |
|
Brand Name : Lebron-Machinery
Model Number : Door Frame Roll Forming Machine
Certification : ISO 9001: 2008
Place of Origin : Wuxi, Jiangsu, China
MOQ : 1 Set
Price : USD10000~20000 per Set
Payment Terms : L/C, T/T
Supply Ability : 35 Sets per Month
Delivery Time : 30 Working Days
Packaging Details : Standard Export Packing
Main Power : 7.5KW
Size : 7.5*1.2*1.0m
Weight : Approx. 8tons
Speed : 20-25m/min
Roller : 45# Steel, coated with hard chrome
Roller Station : 18 Stations
High Production Capacity Long Service Time Fully Automatic Door Frame Roll Forming Machine
1. Description of Door Frame Roll Forming Machine
The door frame forming machine is a roll forming machine used in the steel plate cold forming industry. It can continuously shape the steel plate through an automatic press according to the customer's requirements and cut flies to a certain length.
A door frame roll forming machine generally consists of a decoiler (a Hydraulic Decoiler is optional), a main roll forming unit, a transmission system, a cutting tool, a hydraulic system, a hydraulic oil pump, a PLC control cabinet, and run-out tables
The punching also can be designed according to your needs. the door frame surface will be very smooth and beautiful without any scratches on the surface.
This Door Frame Roll Forming machine can produce various kinds of Roll Formed Aluminum & GI Steel Door or Window frames.
2. Technical Parameters of Door Frame Roll Forming Machine
Weight | About 6000kgs |
Size | About 7.5m*1.2m*1.0m (L x W x H) |
Suitable Material | Galvanized steel strip |
Thickness | 0.8~1.2mm |
Coil width | 240mm |
Yield strength | 235Mpa |
Rollers station | 18 Stations |
Roller Shaft Diameter | 75 mm |
Roll Forming Speed | 20-25m/min |
Production Speed | Approx.15m/min |
Roller Material | 45# steel, coated with chrome, quenched |
Cutter material | Cr12 mold steel, with quenched treatment |
Controlling system | PLC and Converter |
Electric power requirement | Main power: 7.5 KW |
Hydraulic power: 4 KW | |
Electric voltage | 380V 50Hz 3 Phase (as per local requirement) |
3. Main components of Door Frame Roll Forming Machine
Name | Quantity |
Uncoiler | 1set |
Coil sheet guiding device | 1set |
Main roll forming system | 1set |
Punching device | 1set |
Cutting device | 1set |
Hydraulic station | 1set |
PLC control system | 1set |
Support table | 1set |
4. Our Service
After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.
The installation period is around 5 days. The buyer should have been prepared for the steel sheet, and foundation position of the machine before the seller’s technician's departure.
The buyer should arrange the accommodation, food, and traffic in the destination
Training period: 2 days. (we can supply training on the operation spot if the buyer needs)
Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.
5. FAQ
1Q: Are you a factory or trading company?
1A: We are a factory.
2Q: Where is your factory located?
2A: Our factory is located in Wuxi City, Jiangsu Province, China. You are warmly welcome to visit us!
3Q: What should I provide if I would love to customize the machine?
3A: We need profile drawing, and material information, such as feeding width, thickness, yield strength of steel coil, voltage and your special requirements.
4Q: What I should do if I just start to know roll forming machinery?
4A: Contact us immediately, we provide free consultant pre-sales service.
5Q: Can you make the machine according to my design or phototype?
5A: Yes. We have a professional designer for working out the most suitable design and production plan for the machine that you are going to book with us
6Q: How can I trust you that machines passed testing running before shipping?
6A: We record the testing video for your reference. You are welcome to visit us and test the machine in our factory.
7Q: Do you provide installing and training overseas?
7A: Overseas machine installation and worker training services are optional.
8Q: How is your after-sales support?
8A: We provide technical support online as well as overseas services by skillful technicians.
9Q: Guarantee period:
9A: Within one year from the date of finishing commissioning. The guarantee covers all the electric, mechanic and hydraulic parts in the line except for the easy-worn parts.
![]() |
Fully Automatic Door Frame Roll Forming Machine High Production Capacity Images |